Loading

Water purification system in Gosaba

WATER PURIFICATION SYSTEM IN GOSABA WhatsApp Image 2017-11-04 at 12.12.56 PM (1) 2.21.44 pm
WATER PURIFICATION SYSTEM IN GOSABA
WhatsApp Image 2017-11-04 at 12.12.56 PM (1) 2.21.44 pm

System: 5 KW Off-Grid Solar Power Generating System with 3000Ah, 12V battery bank

Location: Gosaba, West Bengal

Client: South Asian Forum of Environment (SAFE)

Description: This is a pilot project powering a water purification system. SAFE has already assigned us eight more such projects in West Bengal and Assam. This is a World Bank funded organization and plans to adopt this model for every district in West Bengal and Assam.